|

For Winners Only
The first place every winner goes after the race is into "The Winner's Circle." Not coincidentally, the last place a Mickey beverage body or trailer goes before it goes to the customer is also "The Winner's Circle."
Mickey's "Winner's Circle" is actually a separate building, painted throughout in pristine white except, of course, for the familiar black and white checkerboard floor. Every completed unit, including paint and decals, is brought into the "Winner's Circle" for one final, "ultimate" inspection before it is delivered to the customer. The units are checked for welds, mounting, electrical, features and options, painting and decals. The inspections are conducted by a well-trained, dedicated team of Quality Assurance Specialists whose only job is to make sure that every unit is a "winner." It's part of our 100% quality commitment.
Mickey's Winner's Circle is equipped with a new computer system networked to the sales, engineering and scheduling departments so that the trained staff can check the actual unit against the original work order on a feature-by-feature basis.
|